Assessment — Migration Readiness

A scored readiness checklist for evaluating an organization's preparedness to migrate workloads to Azure. This assessment covers 8 dimensions, each scored 1-5, producing a total readiness score of 40-200 with interpretation guidance, timeline estimation, and resource mapping to CSA-in-a-Box documentation.


How to use this assessment

  1. Assemble a cross-functional team (infrastructure, data, security, finance, leadership)
  2. Work through each of the 8 assessment areas below
  3. Answer the questionnaire items honestly — score where you are, not where you want to be
  4. Calculate the area scores and total score
  5. Use the scoring interpretation table to determine your readiness level
  6. Review the migration timeline estimator for planning
  7. Complete the risk assessment matrix for identified gaps
  8. Map gaps to CSA-in-a-Box resources for remediation guidance

Scoring rubric

Each item is scored on a 1-5 scale. Apply these definitions consistently across all areas:

Score Level Definition
1 Not Ready No capability exists. No plans in place. Significant investment needed before migration can begin.
2 Early Stage Initial awareness. Some ad-hoc efforts. No formal processes or documentation. Major gaps remain.
3 Developing Formal processes emerging. Partial coverage. Key gaps identified and plans exist to address them. Migration could proceed with risk acceptance.
4 Capable Solid foundation in place. Most requirements met. Minor gaps with clear remediation paths. Ready to proceed with normal risk.
5 Fully Ready Comprehensive capability. Documented, tested, and mature. Ready to proceed immediately with low risk.

Assessment areas

1. Infrastructure Assessment

Evaluate your current infrastructure state, network readiness, and dependency mapping.

# Question Scoring guidance Score (1-5)
1.1 Do you have a complete inventory of servers, storage, and network devices? 1 = No inventory; 3 = Partial inventory, some gaps; 5 = Automated CMDB with current data ___
1.2 Is your network architecture documented with bandwidth, latency, and connectivity details? 1 = No documentation; 3 = Basic diagrams exist; 5 = Full topology with performance baselines ___
1.3 Have you mapped dependencies between applications, databases, and infrastructure components? 1 = No dependency mapping; 3 = Key systems mapped; 5 = Automated dependency discovery in place ___
1.4 Do you have sufficient network bandwidth for cloud connectivity (ExpressRoute, VPN, or internet)? 1 = Unknown or insufficient; 3 = Adequate for initial workloads; 5 = ExpressRoute provisioned with redundancy ___
1.5 Have you assessed your DNS, Active Directory, and identity infrastructure for cloud readiness? 1 = No assessment; 3 = Assessment done, gaps identified; 5 = Identity infrastructure cloud-ready, Entra ID sync configured ___

Area 1 Score: ___ / 25

Infrastructure discovery tools

Azure Migrate provides agentless discovery and assessment for on-premises VMs, databases, and web applications. Start with the discovery phase before scoring this area if you lack a current inventory.


2. Data Assessment

Evaluate data volume, complexity, quality, and sensitivity classification.

# Question Scoring guidance Score (1-5)
2.1 Do you know the total volume and growth rate of data to be migrated? 1 = Unknown; 3 = Rough estimates; 5 = Precise measurements with growth projections ___
2.2 Have you classified data by sensitivity level (public, internal, confidential, restricted)? 1 = No classification; 3 = Some data classified; 5 = Comprehensive classification with automated labeling ___
2.3 Is data quality measured and documented (accuracy, completeness, timeliness, consistency)? 1 = No measurement; 3 = Ad-hoc quality checks; 5 = Automated quality monitoring with SLAs ___
2.4 Do you understand data residency and sovereignty requirements? 1 = Unknown; 3 = Requirements identified but not fully mapped; 5 = Documented requirements with target region mapping ___
2.5 Have you identified database migration paths (schema, stored procedures, ETL dependencies)? 1 = No assessment; 3 = Key databases assessed; 5 = Complete migration paths documented with compatibility testing done ___

Area 2 Score: ___ / 25


3. Application Assessment

Evaluate cloud compatibility, refactoring needs, and application dependencies.

# Question Scoring guidance Score (1-5)
3.1 Have you categorized applications using the 6 Rs (Retire, Retain, Rehost, Replatform, Refactor, Replace)? 1 = No categorization; 3 = Major apps categorized; 5 = All apps categorized with migration approach documented ___
3.2 Do you understand which applications have hard dependencies on on-premises infrastructure? 1 = Unknown; 3 = Key blockers identified; 5 = All dependencies mapped with remediation plans ___
3.3 Have you identified applications that require refactoring for cloud (e.g., stateful sessions, local file system dependencies)? 1 = No assessment; 3 = Major apps assessed; 5 = All apps assessed with refactoring effort estimated ___
3.4 Do you have testing environments and processes to validate migrated applications? 1 = No test environment; 3 = Manual testing capability; 5 = Automated CI/CD with cloud-based test environments ___
3.5 Have you evaluated SaaS alternatives for custom-built applications? 1 = Not considered; 3 = Some evaluation; 5 = Systematic evaluation with business case for each candidate ___

Area 3 Score: ___ / 25


4. Skills Assessment

Evaluate team capabilities, training needs, and partner requirements.

# Question Scoring guidance Score (1-5)
4.1 Does your team have hands-on experience with Azure services (compute, storage, networking, identity)? 1 = No Azure experience; 3 = Some team members certified or experienced; 5 = Deep Azure expertise across the team ___
4.2 Do you have Infrastructure-as-Code (IaC) skills (Bicep, Terraform, ARM templates)? 1 = No IaC experience; 3 = Some experience, mostly manual deployments; 5 = IaC is standard practice for all deployments ___
4.3 Does your team understand cloud security and identity concepts (Entra ID, RBAC, managed identities, private endpoints)? 1 = No cloud security skills; 3 = Basic understanding; 5 = Deep expertise, able to architect zero trust environments ___
4.4 Have you identified skills gaps and created training plans? 1 = No assessment; 3 = Gaps identified, training planned; 5 = Training underway with measurable progress ___
4.5 Have you evaluated the need for a migration partner or managed service provider? 1 = Not considered; 3 = Evaluating options; 5 = Partner selected and engaged (or determined unnecessary) ___

Area 4 Score: ___ / 25

CSA-in-a-Box learning paths

The Developer Pathways guide and Quickstart guides provide role-based onboarding for platform administrators, data engineers, BI developers, security admins, and data scientists.


5. Governance & Compliance

Evaluate regulatory requirements, data sovereignty, and audit readiness.

# Question Scoring guidance Score (1-5)
5.1 Have you identified all regulatory frameworks that apply to your workloads (FedRAMP, HIPAA, PCI-DSS, CMMC, SOC 2, etc.)? 1 = Unknown; 3 = Major frameworks identified; 5 = Complete framework inventory with applicability analysis ___
5.2 Do you understand the shared responsibility model for cloud compliance? 1 = No understanding; 3 = Basic awareness; 5 = Documented shared responsibility matrix for each framework ___
5.3 Do you have existing compliance documentation (policies, procedures, evidence) that can be adapted for cloud? 1 = No documentation; 3 = Some policies exist; 5 = Comprehensive compliance documentation, actively maintained ___
5.4 Have you mapped data sovereignty requirements to Azure regions (commercial vs. government)? 1 = Not assessed; 3 = Requirements known, regions not selected; 5 = Region strategy documented with compliance validation ___
5.5 Do you have an audit trail capability that meets your compliance requirements? 1 = No audit capability; 3 = Basic logging; 5 = Comprehensive, tamper-resistant audit trail with retention policies ___

Area 5 Score: ___ / 25

Compliance assessment

Use the Compliance Gap Analysis assessment for a detailed control-by-control analysis. The Compliance Documentation maps CSA-in-a-Box controls to NIST 800-53, FedRAMP, CMMC, HIPAA, SOC 2, and PCI-DSS.


6. Security Readiness

Evaluate identity management, encryption, and monitoring capabilities.

# Question Scoring guidance Score (1-5)
6.1 Do you have a centralized identity provider capable of federation with Entra ID? 1 = No centralized IdP; 3 = IdP exists but federation not configured; 5 = Federation configured and tested with MFA enforced ___
6.2 Do you have encryption standards for data at rest and in transit? 1 = No encryption standards; 3 = Some encryption in place; 5 = Comprehensive encryption with key management (HSM/KMS) ___
6.3 Do you have security monitoring and incident response capabilities? 1 = No monitoring; 3 = Basic alerting; 5 = SIEM/SOAR deployed with documented incident response procedures ___
6.4 Do you have vulnerability management and patch management processes? 1 = No process; 3 = Manual, periodic scanning; 5 = Automated scanning with SLA-driven remediation ___
6.5 Have you conducted a security assessment of your cloud migration plan? 1 = No assessment; 3 = Assessment planned; 5 = Threat modeling complete with mitigations documented ___

Area 6 Score: ___ / 25


7. Financial Planning

Evaluate TCO analysis, budget approval, and ROI model.

# Question Scoring guidance Score (1-5)
7.1 Have you completed a Total Cost of Ownership (TCO) analysis comparing on-premises to cloud? 1 = Not started; 3 = Rough estimates; 5 = Detailed TCO with Azure Pricing Calculator validated estimates ___
7.2 Do you have budget approval for the migration project (including dual-running costs during transition)? 1 = No budget; 3 = Budget requested; 5 = Budget approved with contingency ___
7.3 Have you established a FinOps practice for ongoing cloud cost management? 1 = No FinOps awareness; 3 = Basic cost monitoring; 5 = FinOps team with cost allocation, optimization, and forecasting ___
7.4 Do you have a cost allocation model for cloud resources (tagging strategy, chargeback/showback)? 1 = No model; 3 = Tagging strategy defined; 5 = Automated tagging, cost allocation, and reporting in place ___
7.5 Have you modeled the ROI or business case for migration? 1 = No business case; 3 = Qualitative benefits identified; 5 = Quantified ROI model approved by leadership ___

Area 7 Score: ___ / 25

Cost management resources

See Cost Management for Azure cost optimization strategies, reserved instance guidance, and FinOps patterns. The Cost Optimization Best Practices guide covers tagging, rightsizing, and budget alerting.


8. Organizational Change

Evaluate executive sponsorship, change management plan, and communication strategy.

# Question Scoring guidance Score (1-5)
8.1 Do you have executive sponsorship for the cloud migration with clear authority and accountability? 1 = No sponsor; 3 = Sponsor identified but not engaged; 5 = Active executive sponsor with regular involvement ___
8.2 Have you developed a change management plan that addresses people, process, and technology impacts? 1 = No plan; 3 = Basic plan exists; 5 = Comprehensive change plan with stakeholder analysis and timeline ___
8.3 Is there a communication strategy for informing stakeholders about migration impacts and timelines? 1 = No strategy; 3 = Ad-hoc communication; 5 = Structured communication plan with regular updates and feedback loops ___
8.4 Have you identified and engaged champions or early adopters within the organization? 1 = Not considered; 3 = Some champions identified; 5 = Champions engaged with defined roles in migration support ___
8.5 Do you have a rollback or continuity plan if migration encounters critical issues? 1 = No plan; 3 = Basic rollback approach; 5 = Documented rollback with tested procedures and decision criteria ___

Area 8 Score: ___ / 25


Scoring summary

Transfer your area scores to calculate the total:

Area Max Score Your Score
1. Infrastructure Assessment 25 ___
2. Data Assessment 25 ___
3. Application Assessment 25 ___
4. Skills Assessment 25 ___
5. Governance & Compliance 25 ___
6. Security Readiness 25 ___
7. Financial Planning 25 ___
8. Organizational Change 25 ___
Total 200 ___

Scoring interpretation

Total Score Readiness Level Recommended Actions
160-200 Ready — Proceed with migration planning. Minor gaps exist but are manageable within a normal project timeline. Begin migration project. Address remaining gaps in parallel. Focus on execution planning, wave grouping, and timeline finalization.
120-159 Mostly Ready — Foundation is solid but notable gaps need attention before full-scale migration. Address gaps scoring 1-2 before launching migration waves. Consider a pilot migration of non-critical workloads while remediating. Target 4-8 weeks of preparation.
80-119 Developing — Several significant gaps exist. Migration is possible but carries elevated risk without remediation. Develop formal remediation plan for all areas scoring below 3. Invest in skills development and compliance documentation. Target 2-4 months of preparation before first migration wave.
40-79 Not Ready — Foundational work is needed across multiple dimensions before migration should begin. Focus on building fundamentals: inventory, skills, governance, security, and financial planning. Consider engaging a migration partner. Target 4-6 months of foundational work before reassessing.

Migration timeline estimator

Use your total score and the number of workloads to estimate a migration timeline. These are rough estimates — adjust based on complexity, compliance requirements, and team capacity.

Total Score Small (1-10 workloads) Medium (10-50 workloads) Large (50+ workloads)
160-200 2-4 months 4-8 months 8-14 months
120-159 4-7 months 7-12 months 12-20 months
80-119 7-10 months 10-16 months 16-28 months
40-79 10-14 months 14-24 months 24-36 months

Federal timelines

For federal agencies requiring FedRAMP or DoD IL4/IL5 authorization, add 6-12 months for ATO activities. See Federal Cloud Adoption Trends for current ATO timeline analysis.


Risk assessment matrix

For any area scoring 1 or 2, document the risk and mitigation plan:

Risk Area Specific Risk Impact (H/M/L) Likelihood (H/M/L) Risk Level Mitigation Strategy Owner Target Date
Example: Skills Team lacks IaC experience H H Critical Bicep training + CSA-in-a-Box quickstarts Engineering Lead [Date]

Risk level matrix:

High Likelihood Medium Likelihood Low Likelihood
High Impact Critical High Medium
Medium Impact High Medium Low
Low Impact Medium Low Low

Area-specific recommendations

Low-scoring areas — quick wins

If specific areas score significantly lower than others, consider these targeted quick wins before launching a full migration:

Area Scoring 1-2 Quick Win Actions Timeframe
Infrastructure Run Azure Migrate discovery; document network topology; assess ExpressRoute needs 2-4 weeks
Data Conduct data inventory with sensitivity classification; identify top 10 largest data stores 2-3 weeks
Applications Categorize top 20 applications using the 6 Rs; identify quick-win rehost candidates 1-2 weeks
Skills Enroll team in Azure Fundamentals (AZ-900) and role-specific certifications; assign CSA-in-a-Box quickstarts 4-8 weeks
Governance Identify applicable frameworks; review Azure shared responsibility model; begin policy documentation 2-4 weeks
Security Deploy Entra ID with MFA; conduct basic threat assessment; identify monitoring gaps 3-6 weeks
Financial Complete Azure Pricing Calculator estimate; model 12-month TCO; present business case to leadership 2-4 weeks
Organizational Identify executive sponsor; draft communication plan; recruit 2-3 champions from key business units 2-3 weeks

Federal-specific considerations

For federal agencies, the following additional factors should be evaluated alongside each area:

  • Infrastructure (Area 1): Verify that target Azure region supports required impact level (IL4/IL5). See Government Service Matrix.
  • Data (Area 2): CUI, FTI, PII, and PHI classifications drive region selection and encryption requirements.
  • Governance (Area 5): FedRAMP ATO timeline should be included in migration planning. Add 6-12 months for initial authorization.
  • Security (Area 6): CISA BOD compliance, zero trust requirements (M-22-09), and continuous monitoring obligations apply.
  • Financial (Area 7): Federal procurement timelines (GWAC, BPA, task orders) add lead time. Factor in ATO costs.
  • Organizational (Area 8): FITARA compliance requires CIO involvement in all IT investment decisions.

CSA-in-a-Box resource mapping

For each assessment area, the following CSA-in-a-Box resources provide guidance and implementation support:

Assessment Area CSA-in-a-Box Resources
1. Infrastructure Architecture Overview, Hub-Spoke Topology, Getting Started
2. Data Data Governance, Data Quality, Medallion Architecture, Purview Guide
3. Applications Platform Services, Migration Guides, Decision Guides
4. Skills Developer Pathways, Quickstarts, Tutorials
5. Governance & Compliance Compliance Documentation, Compliance Gap Analysis, FedRAMP Guide
6. Security Security & Compliance Best Practices, Identity & Secrets Flow, Environment Protection
7. Financial Planning Cost Management, Cost Optimization Best Practices
8. Organizational Change Production Checklist, Rollback Procedures, DR Planning

Next steps

After completing this assessment:

  • Calculate total score and identify readiness level
  • Document all items scoring 1 or 2 in the risk assessment matrix
  • Create remediation plans for critical and high risks
  • If score is 120+, begin migration planning with the Getting Started guide
  • If score is below 120, focus on foundational work and reassess in 30-60 days
  • For compliance-sensitive workloads, complete the Compliance Gap Analysis
  • For ongoing improvement tracking, establish baseline with the Platform Maturity Model


Last updated: 2026-04-30 Review cadence: Annual Owner: CSA-in-a-Box platform team